Wall Fire Rating Requirements

beginner

Create a specification that requires all load-bearing walls to have a fire rating property.

3 hints available
Start Challenge

Bedroom Minimum Area

beginner

Ensure bedrooms have a minimum floor area of 10 square meters.

3 hints available
Start Challenge
🌿

Intermediate Challenges

(3)

Brick Wall Classification and Naming

intermediate

Brick wall types must be classified and follow a naming convention.

3 hints available
Start Challenge

HVAC System Assignment

intermediate

Every duct must be part of an HVAC distribution system.

3 hints available
Start Challenge

Concrete Casting Method

intermediate

Concrete elements must specify their casting method as either INSITU or PRECAST.

3 hints available
Start Challenge
🌳

Advanced Challenges

(1)

Equipment Spatial Location

advanced

Every equipment must be located in a space for proper facility management.